GasNet - O Site do Gás Natural e GNV    
Distribuição Produção Legislação Termelétricas GD - Geração Distribuída Novas Tecnologias Cursos & Eventos Instituições

Tenha o GasNet no seu celular

Disponível para iPhone na AppStore

Disponível para Android na GooglePlay

 
 
The Pipeline + Energy Expo
(4/4/2017 - 6/4/2017)
Cox Business Center, Tulsa, Oklahoma
PennWell

 
 
EXPOMAFE - Feira Internacional de Máquinas-Ferrame ...
(9/5/2017 - 13/5/2017)
São Paulo Expo Exhibition & Convention Center
Informa Exhibitions/Abimaq
Horários: 3ª a 6ª de 10 às 19h; Sábado de 9 às 17 h
Endereço: Rodovia dos Imigrantes Km 1,5

 
 
Power-Gen India & Central Asia
(17/5/2017 - 19/5/2017)
Pragati Maidan, New Delhi, India
PennWell

 
 
Atena Engenharia Leia as histórias do Netinho (nosso mascote) Acesse a nossa seção e saiba tudo sobre GNV Leia as histórias do Netinho (nosso mascote)
  Produção - Novidades Tecnológicas
  Autor/Fonte: Oil & Gas Journal
  Data: 22/09/2015

    Statoil brings first subsea gas compression plant onl


Statoil ASA has brought the first subsea gas compression plant online at Aasgard field in the Norwegian Sea. The company says the technology will add 306 million boe over the life of the field.

Compression closer to the well increases recovery as well pressure decreases over time. Traditionally, compression plants are installed on platforms or onshore. The Aasgard subsea plant is on the ocean floor in 300 m of water close to the wellhead.

Statoil says that moving gas compression from the platform to the wellhead increases recovery rates and the life of a field. Prior to gas compression, gas and liquids are separated out and, after pressure boosting, recombined and sent by pipeline about 40 km to Aasgard B.

Recovery from the Midgard reservoir on Aasgard will increase to 87% from 67%, and to 84% from 59% in the Mikkel reservoir, the company said. Siri Espedal Kindem, senior vice-president for Statoil’s Aasgard operations, said that the life of both reservoirs will be extended to 2032.

Statoil’s subsea gas compression project cost about 19 billion kroner and took more than 5 years to complete.

Statoil operates Aasgard and owns 34.57% with partners Petoro AS 35.69%, Eni Norge AS 14.82%, Total E&P Norge AS 7.68%, and ExxonMobil E&P Norway AS 7.24%.

 

 

Fonte: Michael T. Slocum, Oil & Gas Journal, set/2015

 

 

Compartilhe este texto com seus amigos:
 



  Gasodutos
  Cogeração
  GNC

Informa Group
EXPOMAFE - Feira Internacional de Máquinas-Ferramenta

  CopyRight © GasNet - 2013